Flex Gas's Ahuroa Gas Storage Facility was commissioned in 2011. The facility has added a new dimension to supply/demand management and flexibility to gas supplies.
The chart below shows the stock injections, withdrawals and closing balance for the gas storage facility. This data is sourced from First Gas.
The facility can store up to 18 PJ. It can inject up to 27 TJ per day and withdraw up to 45 TJ per day.
An expansion of the facility is planned to increase injection and withdrawal capacity to 65 TJ per day by 2021.
Original Link: https://www.gasindustry.co.nz/about-the-industry/gas-industry-information-portal/gas-storage-information-chart/
Page last saved: 25 September, 2020