Flex Gas's Ahuroa Gas Storage Facility  was commissioned in 2011. The facility has added a new dimension to supply/demand management and flexibility to gas supplies. 

The chart below shows the stock injections, withdrawals and closing balance for the gas storage facility. This data is sourced from First Gas.

The facility can store up to 18 PJ. It can inject up to 27 TJ per day and withdraw up to 45 TJ per day.

An expansion of the facility is planned to increase injection and withdrawal capacity to 65 TJ per day by 2021.

Disclaimer

Gas Industry Co makes no representations, warranties or guarantees, whether express or implied, that the content on this page is accurate, complete or up-to-date.

Gas Industry Co does not guarantee that this page, or any content in it, will always be available or be uninterrupted.

Gas Industry Co will not be liable to any user for any loss or damage, whether in contract, tort (including negligence), breach of statutory duty, or otherwise, even if foreseeable, arising under or in connection with:

  • use of, or inability to use, this page; or
  • reliance on, or use, or disclosure of, any content displayed on this page
Page last saved: 25 May, 2020
Sign up to receive regular updates from Gas Industry Co

Get in touch

P 04 472 1800
A Gas Industry Co
Level 8, The Todd Building
95 Customhouse Quay
PO Box 10-646
Wellington 6143

Copyright © 2020 Gas Industry Company | Terms & Conditions