Scroll to top

Long-Term Capacity

Following the capacity constraint in Vector's North Pipeline in 2009 Gas Industry Co implemented the Bridge Commitments as a short-term aid to capacity issues while for the longer term, Gas Industry Co analysed capacity issues and then proposed and implemented a set of projects known as the Gas Transmission Investment Programme (GTIP). 

Workshops and consultations relating to this pre-GTIP work can be found in this section.

Page last saved: 27 May, 2019


Original Link: https://www.gasindustry.co.nz/work-programmes/transmission-pipeline-access/background/long-term/

Page last saved: 27 May, 2019