Gas Industry Co issued its Analysis of Submissions on the September 2016 Options Paper - Wholesale Levy Assurance. Seven submissions were received.
A Maui Pipeline Operating Code (MPOC) change request received on 5 May 2015 proposes changes to the way change requests are themselves processed.
The 10 October 2014 MPOC Change Request mostly relates to a market-based balancing regime.
Process
Section 29 of the MPOC assigns Gas Industry Co a role in processing any proposed amendment to the MPOC (Change Request). That role is to consult on the Change Request with the gas industry and determine whether or not to support it.
Date Published: 17 February 2014
On 14 February 2014 Gas Industry Co received a request from Maui Development Limited (MDL) to make changes to the Maui Pipeline Operating Code (MPOC). On 2 May 2014, Gas Industry Co released its Final Recommendation.
Note that this timetable depends on no material issues being raised in submissions. Process
Indicative Date
Call for submissions on change request and draft recommendation
Fri 12 April 2013
Submissions due
Thur 2 May 2013
Final recommendation
Fri 17 May 2013
Note that this timetable depends on no material issues being raised in submissions. Process
Indicative Date
Call for submissions on change request and draft recommendation
Tue 29 January 2013
Submissions due
Fri 15 February 2013
Final recommendation
Fri 1 March 2013
Although this letter relates to the broader topic of Gas Transmission Balancing, we included a link to it here since it refers to the October 2011 MPOC Change Request and related matters.
Date Published: 08 June 2011
Having considered submissions made in respect of this change request, Gas Industry Co has prepared the following draft recommendation. Submissions closed Tuesday 28 June 2011.
Gas Industry Co considered submissions on the Draft Final Recommendation and made a Final Recommendation not to support the change request.