This paper invited submissions from allocation participants on the merits of replacing the initial allocation results produced by the allocation agent under the Gas (Downstream Reconciliation) Rules 2008 (the Rules) with D+1 allocation results produced by Gas Industry Co for the duration of the D+1 trial.

The reason for doing the replacement is to permit Vector/First Gas to use the D+1 allocations to settle the Balancing and Peaking Pool (BPP) and for transmission billing, so that the same allocation results are used for those purposes as Vector/First Gas shippers have used throughout the month to manage their gas positions.

Submissions closed Wednesday 16 September 2015. A Summary of Submissions can be found in the Related Documents section below.

Related Documents

  • Consultation on Special Allocations for D+1 Trial
    122 KB Adobe Acrobat PDF file
  • Special Allocation Summary of Submissions - submissions closed 16 September 2015
    101 KB Adobe Acrobat PDF file

Submissions

  • Genesisenergy
    Special allocations to replace initial with D+1 allocation results 45 KB Adobe Acrobat PDF file
  • Mighty River Power
    Letter to Gas Industry Company re SpecialAllocationD+1 15 September 2015 86 KB Adobe Acrobat PDF file
  • Vector
    Vector submission on Special Allocations for D+1 123 KB Adobe Acrobat PDF file
  • Trustpower
    Special Allocation to replace initial with D+1 272 KB Adobe Acrobat PDF file
  • Greymouth Petroleum
    Greymouth Gas Submission on Special Allocations ID 9738 176 KB Adobe Acrobat PDF file
  • Contact Energy
    CEN Submission re D+1 51 KB Adobe Acrobat PDF file
  • Nova Energy
    Nova submission on Special Allocations ID 9976 151 KB Adobe Acrobat PDF file

Stay in touch

Keep up to date with our latest news and analysis by subscribing to our regular newsletter