On 10 October 2014 Gas Industry Co received a request from Maui Development Limited (MDL) to consider and make a recommendation in respect of proposed changes to the Maui Pipeline Operating Code (MPOC) to introduce daily cash-out of any user imbalances (over an allowed tolerance). MDL had been discussing a draft of this Market-Based Balancing Change Request (MBBCR) with Maui pipeline users and wider stakeholders.

Submissions were invited by 24 November 2014 and Gas Industry Co subsequently invited cross-submissions for submitters to respond to points raised by others.

Note: The excel document below was updated on 21 November 2014 to correct an error. The Frankley Road 'Flow' data was displaying the delivery metered quantity in the receipt column and vice versa. If you had downloaded the document prior to this date it is recommended you check the updated version.

In anticipation of receiving the Change Request, and with a view to making the processing of it as streamlined as possible, Gas Industry Co began preliminary work on a cost benefit analysis (CBA).

After receiving the MBBCR Gas Industry Co requested more information from MDL, which was received on 17 October 2014. The letter containing that information is attached to the MBBCR. It confirmed MDL’s intention to implement the MBBCR promptly and states MDL’s view that the cost-benefit analysis should compare the MBBCR to the version of the MPOC then in force. 

Gas Industry Co's took the view that it was appropriate to compare the MBBCR to the version of the MPOC that would likely be in place if the MBBCR was not supported. This reflected Gas Industry Co's belief that, while the MBBCR incorporated elements of the previously supported but not implemented back-to-back Change Requests, from MDL, it was unlikely that either the entirety or any element of back-to-back balancing would be implemented if the MBBCR was not supported. Gas Industry Co therefore proposed to compare the entirety of the MBBCR to the MPOC then in force, rather than comparing it to a version of the MPOC that incorporated the back-to-back amendments.

The MBBCR represented further efforts to address long-standing gas balancing issues, after the industry requested in 2009 that regulatory proposals be deferred and that it be given an opportunity to develop transmission code-based improvements. In making its Draft Recommendation, Gas Industry Co’s role is to consult on the Change Request and make a recommendation either ‘supporting’ or ‘not supporting’ it. Gas Industry Co particularly assesses whether a Change Request will improve on the status quo and how it aligns with relevant objectives of the Gas Act 1992, and costs and benefits.

5 November Workshop

A workshop was hosted by Gas Industry Co on 5 November 2014 to allow potential submitters an opportunity to discuss how the costs and benefits of the MBBCR should be assessed. The discussion was led by Dr. John Small, who Gas Industry Co engaged to develop the cost benefit analysis. Participants identified some information that would assist their understanding. This information is posted at the end of the list of download links in the Change Request section.

Related Documents

  • Note on changes to MBB Change Request amendments from pre-consultation - 10 October 2014
    34 KB Adobe Acrobat PDF file
  • MPOC - Market-Based Balancing amendments (marked up) Final vs 'Pre-consultation' Draft - 10 October 2014
    721 KB Adobe Acrobat PDF file
  • MPOC - Market-Based Balancing amendments (marked up) -10 October 2014
    754 KB Adobe Acrobat PDF file
  • MPOC Change Request application Market-Based Balancing - 10 October 2014
    122 KB Adobe Acrobat PDF file
  • Draft Report - Daily Cash-Outs on Maui Pipeline: Outline of a Cost-Benefit Analysis - 22 October 2014
    513 KB Adobe Acrobat PDF file
  • Letter from MDL to GIC - 17 October 2014
    374 KB Adobe Acrobat PDF file
  • MDL Workshop presentation: Key Elements of the 'Market-Based Balancing' Change Request - 5 November 2014
    258 KB Adobe Acrobat PDF file
  • Gas Industry Co Workshop presentation - 5 November 2014
    206 KB Adobe Acrobat PDF file
  • MPOC 13 Oct '11, 14 Feb '14, 10 Oct '14 CRs compared to current working version - 11 November 2014
    2.3 MB Adobe Acrobat PDF file
  • Copy of Requested data for industry SQMQ: 1 Jan 09 - 5 Nov 14, Hourly LP: 29 Aug 06 - 31 Oct 14 - 21 November 2014
    4.8 MB Excel spreadsheet
  • MBB CR Cash Out Mechanism Explained - A presentation by emsTradepoint - November 2014
    821 KB Adobe Acrobat PDF file

Submissions

  • Genesis Energy Limited
    Genesis Energy Submission to GIC on MPOC change request Oct2014 72 KB Adobe Acrobat PDF file
  • Trustpower
    Market Based Balancing MBB October 2014 299 KB Adobe Acrobat PDF file
  • OMV New Zealand Ltd
    MBB MPOC CR CBA OMV submission 2014 11 24 420 KB Adobe Acrobat PDF file
  • Methanex New Zealand Limited
    Methanex submission MPOC CR 10 Oct 2014 801 KB Adobe Acrobat PDF file
  • Greymouth Gas New Zealand Limited
    GGNZ Letter to GIC re MPOC CR on Daily Cash Outs 24 November 2014 221 KB Adobe Acrobat PDF file
  • New Zealand Steel submission on MBB MPOC Change Request
    141124 New Zealand Steel Submission on the MPOC Change Request October 2014 420 KB Adobe Acrobat PDF file
  • MDL
    MDL submission mbbCR 24November2014 with clerical errors 1.6 MB Adobe Acrobat PDF file
  • emsTradepoint Limited
    141124 emsTradepoint Submission to the GIC MBB CR 647 KB Adobe Acrobat PDF file
  • Shell submission on MBB MPOC change request
    Shell MBB Change Request Submission 1.4 MB Adobe Acrobat PDF file
  • Hale & Twomey Ltd
    MGUG submission to MDL on B2B MPOC change request 274 KB Adobe Acrobat PDF file
  • Hale & Twomey Ltd
    2014 11 MGUG Submission on Market Based Balancing MPOC CR 324 KB Adobe Acrobat PDF file
  • Contact submission on MBB MPOC change request pre-consultation
    Contact submission re BMM 190914 1.7 MB Adobe Acrobat PDF file
  • Contact submission on MBB MPOC change request pre-consultation
    Contact Submission to GIC re MPOC CR 241114 85 KB Adobe Acrobat PDF file
  • Vector submission on MBB MPOC change request pre-consultation
    141124 MPOC MBB Submissionv3 164 KB Adobe Acrobat PDF file
  • Vector submission on MBB MPOC change request pre-consultation
    Vector submission on MBB 2.6 MB Adobe Acrobat PDF file
  • Carter Holt Harvey submission on MBB MPOC change request
    CHHPP submission on MBB change request 24 November 2014 106 KB Adobe Acrobat PDF file
  • Nova Energy
    Nova Energy ID 2481 127 KB Adobe Acrobat PDF file
  • Mighty River Power
    MRP ID 2482 136 KB Adobe Acrobat PDF file

Stay in touch

Keep up to date with our latest news and analysis by subscribing to our regular newsletter