Consultation on the paper GTAC - Emerging Views on Detailed Design of Access Products, Pricing, and Balancing and Allocation (EV Paper) closed on Friday 23 June 2017, and eleven submissions were received. An Analysis of Submissions on the EV Paper has been prepared by Gas Industry Co, and will be presented at the next GTAC workshop on Wednesday 19 July 2017.  The EV Paper, Analysis of Submissions, and submissions received are available below.

In addition, First Gas will lead a discussion on its proposed approach to stakeholder engagement on the draft GTAC in light of the submissions received on the EV Paper and preliminary draft code changes for the code transition process. Gas Industry Co will then discuss possible changes to the Gas (Downstream Reconciliation) Rules 2008, and the Gas Governance (Critical Contingency Management) Regulations 2008.

If you wish to attend the workshop or participate by teleconference, please RSVP accordingly as detailed below.  

AGENDA

 

10.00am to Noon

Submissions on EV Paper

Noon to 12.30pm

Lunch

12.30 to 1.15pm

Transition process

1.15 to 2.00pm

Consequential changes to Reconciliation Rules and CCM Regulations

 

WORKSHOP DETAILS

 

Venue

Maui Room - Gas Industry Co, Level 8 The Todd Building, 95 Customhouse Quay, Wellington

Date

Wednesday, 19 July 2017

Time

10.00am to 2.00pm (a light lunch will be available)

Teleconference

RSVP Alison O’Connor (by 5.00pm, Thursday 13 July 2017)

Attend Workshop

RSVP Alison O’Connor (by 5.00pm, Thursday 13 July 2017)

19 July GTAC workshop

The presentation material for the 19 July 2017 workshop is available in the Related Documents section below. 

17 May GTAC workshop

At the 17 May GTAC workshop,  First Gas released material on three workstreams: access products, pricing, balancing and allocation. The material analysed detailed design choices that need to be made in drafting the new code, and provides emerging views on the best way to make those design choices. Draft code provisions for access products, pricing, and balancing and allocation have also been released so as to give stakeholders a sense of how the emerging views could be translated into code form. The paper is available below.

First Gas provided a 6-week period for any comments, during which they had one-on-one meetings with stakeholders to help ensure a good understanding of the emerging views and to get as much input as possible to the new code. Consistent with the work plan presented at the February workshop, First Gas intends to release a full draft of the new code in August 2017 and will schedule a further industry workshop around that time.

During the workshop, stakeholders requested that First Gas provide further information on the risks that have been identified with the procurement of IT associated with its new transmission access regime proposals. In response, First Gas developed an Information Paper - Initial Summary of GTAC IT Risks (available below).

The 17 May workshop also included a presentation by Concept Consulting on its paper Gas transmission access code -governance options.  

Related Documents

  • GTAC - Emerging Views on Detailed Design of Access Products, Pricing, Balancing and Allocation
    1.4 MB Adobe Acrobat PDF file
  • 17 May Workshop Presentation Slides: GTAC - Governance Options - May 2017 (Concept Consulting)
    215 KB Adobe Acrobat PDF file
  • 17 May Workshop Presentation Slides: GTAC - Emerging Views on Detailed Design (First Gas)
    886 KB Adobe Acrobat PDF file
  • First Gas Information Paper on Initial Summary of GTAC IT Risks
    109 KB Adobe Acrobat PDF file
  • Analysis of Submissions on May 2017 First Gas EV Paper - 13 July 2017
    552 KB Adobe Acrobat PDF file
  • Presentation of submissions on May 2017 First Gas Emerging Views paper
    228 KB Adobe Acrobat PDF file
  • Presentation of Next Steps for 19 July 2017 workshop
    325 KB Adobe Acrobat PDF file
  • Presentation of submissions on Emerging Views paper for 19 July 2017 workshop
    197 KB Adobe Acrobat PDF file
  • First Gas GTAC Emerging Views Response to Submissions for the 19 July 2017 workshop
    644 KB Adobe Acrobat PDF file
  • Presentation on DR Rules CCM Regs for 19 July 2017 workshop
    234 KB Adobe Acrobat PDF file
  • Possible changes to CCM from GTAC for 19 July 2017 workshop
    23 KB Adobe Acrobat PDF file

Submissions

  • Trustpower
    Trustpower submission GTAC 1.2 MB Adobe Acrobat PDF file
  • Shell New Zealand (2011) Ltd
    Shell GTAC Dev June 2017 362 KB Adobe Acrobat PDF file
  • Greymouth Gas New Zealand Limited
    GGNZ Submission on GTAC Emerging Views 23 June 2017 161 KB Adobe Acrobat PDF file
  • Genesis Energy
    Genesis Energy submission on Gas Transmission Access Code Emerging Views on Detailed Design 73 KB Adobe Acrobat PDF file
  • Vector Limited
    Vector Submission GTAC Emerging Views Paper 251 KB Adobe Acrobat PDF file
  • Contact Energy
    Contact Submission re GTAC emerging views 230617 163 KB Adobe Acrobat PDF file
  • Trellis Energy
    Trellis Energy GTAC Emerging Views Submission Trellis June2017 345 KB Adobe Acrobat PDF file
  • STOS
    STOS Submission On GTAC 243 KB Adobe Acrobat PDF file
  • Major Gas Users Group
    MGUG submission on EV paper 539 KB Adobe Acrobat PDF file
  • Nova
    Nova submission on EV paper 368 KB Adobe Acrobat PDF file
  • Methanex
    Methanex submission on EV paper 1.7 MB Adobe Acrobat PDF file

Stay in touch

Keep up to date with our latest news and analysis by subscribing to our regular newsletter