Scroll to top

Consultation on Special Allocations

This paper invited submissions from allocation participants on the merits of replacing the initial allocation results produced by the allocation agent under the Gas (Downstream Reconciliation) Rules 2008 (the Rules) with D+1 allocation results produced by Gas Industry Co for the duration of the D+1 trial.

The reason for doing the replacement is to permit Vector/First Gas to use the D+1 allocations to settle the Balancing and Peaking Pool (BPP) and for transmission billing, so that the same allocation results are used for those purposes as Vector/First Gas shippers have used throughout the month to manage their gas positions.

Submissions closed Wednesday 16 September 2015. A Summary of Submissions can be found in the Related Documents section below.

Page last saved: 4 September, 2017
Sign up to receive regular updates from Gas Industry Co

Get in touch

P 04 472 1800
A Gas Industry Co
Level 8, The Todd Building
95 Customhouse Quay
PO Box 10-646
Wellington 6143

Copyright © 2020 Gas Industry Company | Terms & Conditions