Date Published: 26 March 2010
Submissions were invited on two issues relating to exemptions from the Gas (Downstream Reconciliation) Rules 2008. First, an urgent direct connect gas gate exemption was granted for the Hunua 3 gas gate in February 2010 where consultation was required on whether the urgent exemption should be varied, replaced or revoked. Second, it was proposed that the unmetered gas gate exemption currently in effect be varied by removing the Waverley gas gate. A gas gate meter has now been installed at Waverley and injection information is available, making the exemption redundant for this gas gate.