Date Published: 26 March 2010

Submissions were invited on two issues relating to exemptions from the Gas (Downstream Reconciliation) Rules 2008. First, an urgent direct connect gas gate exemption was granted for the Hunua 3 gas gate in February 2010 where consultation was required on whether the urgent exemption should be varied, replaced or revoked. Second, it was proposed that the unmetered gas gate exemption currently in effect be varied by removing the Waverley gas gate. A gas gate meter has now been installed at Waverley and injection information is available, making the exemption redundant for this gas gate.

Related Documents

  • Consultation Paper (DR10-01-U & DR09-11-S) - March 2010
    167 KB Adobe Acrobat PDF file

Submissions

  • Gas Industry Company
    Energy Direct 91 KB Adobe Acrobat PDF file
  • Gas Industry Company
    Genesis Energy 46 KB Adobe Acrobat PDF file
  • Gas Industry Company
    Greymouth Gas 53 KB Adobe Acrobat PDF file
  • Gas Industry Company
    Consultation on Proposed Variations to Exemptions under the Gas Downstream Reconciliation Rules 2008 26 Mar Vector Limited 147 KB Adobe Acrobat PDF file

Stay in touch

Keep up to date with our latest news and analysis by subscribing to our regular newsletter