Date Published: 26 January 2009

Submissions and feedback were invited on draft version 1.2 of the Switching Determinations. The draft can be downloaded below, and the proposed changes from the existing Switching Determinations v1.1 are viewable using the MS Word track changes feature.

Please note:

  • Explanations of GAN acceptance and GNW request reason codes have been incorporated for consistency
  • Several of the proposed changes are subject to compliance determinations or exemption decisions and are commented accordingly (in particular, note the updates to Attachment 2 (PR-040 report) to reflect the retailer 2 to 5 day GNW/GNC response timeframe exemption if granted)

Related Documents

  • Consultation Paper - February 2009
    582 KB Word document

Submissions

  • Gas Industry Company
    Mighty River Power 48 KB Adobe Acrobat PDF file
  • Gas Industry Company
    Switching Operations Determinations ConsultRevisedDeterminationsunder 122 KB Adobe Acrobat PDF file

Stay in touch

Keep up to date with our latest news and analysis by subscribing to our regular newsletter