Gas Industry Co recently consulted on a Report that set out how it would perform a GTAC Change Request role, should the final version of the GTAC provide for it.  Submissions on the Report closed on Friday 22 September 2017 and five submissions were received. The Report, and the submissions received are available below. 

The code change provisions of the Gas Transmission Access Code (GTAC) were discussed at the GTAC workshops on 24/25 August. The current draft GTAC assigns a code change role to Gas Industry Co: to consult on proposed changes and make a recommendation to First Gas supporting or not supporting the proposal. In particular, following preliminary discussions on the proposed change between First Gas and holders of TSAs and ICAs, the Change Requestor would submit a Change Request to Gas Industry Co to consult on and make a recommendation to First Gas supporting, or not supporting, the proposal.

Gas Industry Co offered to set out how it would perform this role, as an aid to further stakeholder discussion on the GTAC change process.  

Related Documents

  • Report on how Gas Industry Co would perform a GTAC Change Request role
    350 KB Adobe Acrobat PDF file

Submissions

  • Greymouth Gas New Zealand Ltd
    GGNZ Submission on how GIC would perform a GTAC change request role 21 September 2017 FINAL 135 KB Adobe Acrobat PDF file
  • Genesis Energy
    Genesis Energy submission on GIC change request role 310 KB Adobe Acrobat PDF file
  • Trustpower
    Trustpower submission GIC performance of GTAC change request role 643 KB Adobe Acrobat PDF file
  • Contact Energy
    CEN Submission on GIC Report re Change request Process2 50 KB Adobe Acrobat PDF file
  • Methanex
    Methanex Submission GIC Report on GTAC Change Request Role 22 Sep 2017 894 KB Adobe Acrobat PDF file

Stay in touch

Keep up to date with our latest news and analysis by subscribing to our regular newsletter